Automated People Mover

Location: Minneapolis-St. Paul International Airport
Client: Metropolitan Airports Commission
Year Completed: 1999

This project consisted of below grade and at grade structures for the west half of the tunnel from the GTC East Vertical Circulation to the new parking ramp. The work included demolishing and restructuring a portion of the existing GTC building, electrical utility relocation, general excavation, rock excavation, under slab plumbing, concrete work, below grade waterproofing, perimeter foundation drainage system, backfilling, and paving.